Irrigation Equipment Directory

Pressure and Flow Monitoring

Pressure and flow readings are the vital signs of an irrigation system. Gauges and meters at the pump, filter and field show how the system behaves, so changes stand out long before the crop shows trouble.

Why it matters

A leak, a plugged filter or a worn nozzle all change pressure or flow. Without a baseline you cannot tell normal from broken. Monitoring also gives the water totals needed for scheduling, billing checks and reports.

Step by step

  1. Install gauges or sensors at the pump discharge, before and after filters, and at the line's far end.
  2. Record baseline pressure and flow for every zone when the system is clean, new or freshly serviced.
  3. Check readings weekly or log them automatically, and compare each against the baseline for that zone.
  4. Investigate any change greater than about 10 percent, starting with filters, valves, leaks and nozzles.
  5. Read the totalizer before and after each irrigation, and convert gallons to acre-inches for your records.

What good looks like

Good monitoring catches a change within days, tells you which part of the system is involved, and gives a clear water record. Readings stay close to baseline except after documented repairs or changes.

Worked example

Illustrative case: baseline pressure at the end of a line is 45 psi, now 38 psi. The 7 psi drop is 7 divided by 45, or 15.6 percent, so investigate. Separately, 300 gpm for 8 hours is 300 times 60 times 8, or 144,000 gallons. Divide by 27,154 gallons per acre-inch to get about 5.3 acre-inches applied, which you can enter in your water record.

Common mistakes to avoid

  • Reading pressure only at the pump, which hides problems out in the field.
  • Comparing readings without recording the flow they were taken at.
  • Using unprotected gauges that clog, freeze or fail without anyone noticing.
  • Keeping readings on scraps of paper instead of one dated log.

Safety, legal and compliance notes

Pressure gauges and sensors on pressurized pipe can fail violently. Relieve pressure before servicing, and ask a certified irrigation professional about meter installation and any local water use reporting rules.

What to record

Keep a dated equipment file: purchase date and cost, model and serial numbers, nozzle and sprinkler package charts, pump curves, inspection and repair history, parts replaced, flow and pressure readings and energy use. Good records help you plan replacements, prove performance and support warranty or insurance claims.

When to ask for help

Electrical, well, backflow and chemigation rules vary by state and utility. Talk with the equipment manufacturer or dealer, your extension irrigation specialist, your NRCS or conservation district office, a licensed electrician and your electric utility before you install, modify or repair major equipment. The state directory lists agencies and resources in every state.

Frequently asked questions

What is a good baseline reading?

A baseline is a set of pressure and flow readings from a clean, properly working system. Record it for each zone and update it only after repairs.

How accurate are flow meters?

Accuracy depends on installation, straight pipe lengths and the meter type. Follow the meter's installation requirements and check it against a known volume now and then.

Why log pressure at both ends of a line?

The difference shows friction and elevation losses. If it grows over time, something in the line, such as plugging or leaks, is changing.

Related guides

More from the network

Farm news, humor and ranch life at farm.FM.